New or Changes to Boat Lift and Docks
Any new boat lift or changes must be approved by the Board. Members should:
- Complete an application found in your CBCA directory
- Attached a sketch or drawing on grid paper.
The drawing must state the dimension of and material used for the structure and show how the structure relates to the lot (owner’s property).
Show side lot lines to include “imaginary” extended side-lot lines out of the lake. - Be submitted for Board approval not less than 30 days, prior to the beginning of construction.
- Application must be accompanied by a $1.00 fee, which is non-refundable.